Coeur d’Alene City Hall Remodel & Addition

SCOPE OF WORK:

The Work of Project is defined by the Contract Documents and consists of the following: Building will be Type III-B construction. Building components shall consist of site work, demolition, concrete, asphalt, curbs and sidewalks, steel framing, metal decking, masonry, cabinets, TPO roofing, insulation, metal flashings, wood doors, HM doors and frames, aluminum windows, SV flooring, carpet tiles, rubber base, ceramic tile, acoustical ceiling tile and grid, GWB, painting, toilet compartments, plumbing fixtures, elevator, roof top heat pump units, lighting, power, data, security, fire alarm.

 


File
1479171280wpdm_11-10-16 Addendum 1_with attachments.pdf
1479171286wpdm_11-14-16 Addendum 2_with attachments.pdf
01 General.pdf
02 Architectural.pdf
03 Structural.pdf
04 Mechanical.pdf
05 Electrical.pdf
Bid Spec Book 1.pdf
Bid Spec Book 2.pdf

Version
Download54
Stock
Total Files9
Create DateNovember 7, 2016
Last UpdatedNovember 15, 2016
Download:
Download was expired on January 7, 2017 12:00 AM