SCOPE OF WORK: Construction of three structures, two pre-engineered metal buildings, a maintenance facility; 11,680 SF; 2 drive-thru bays; office crew areas; a herbicide building and a pre-engineered wood framed pole building for warm storage. Site work, waste water discharge, mechanical, electrical and fire protection will also be part of the project
File | Download |
---|---|
Addenda 4 | Download |
Addenda 3 | Download |
Addenda 2 | Download |
Plans | Download |
Specs | Download |
Addenda 1 | Download |
Version | |
Download | 212 |
Stock | |
Total Files | 6 |
Create Date | March 2, 2018 |
Last Updated | March 13, 2018 |