Idaho Panhandle NF – Interagency Natural Resource Center

Scope of Work:
Contract for phase 1 construction of an Interagency Natural Resource Center (INRC) that will serve as a shared use facility for the US Forest Service and Bureau of Land Management in Coeur d'Alene, ID Construction services shall include, but not be limited to the following:
•This Project is Phase 1, of a multiphase project. Project will include construction of office and warehouse space for the Interagency Hot Shot Fire Fighters and the Interagency Dispatch Center (approximately 12,000 sf), wareyard improvements, and an access connection to adjacent boulevard.
•The interior will be finished out as office space and support facilities. The construction will be designed to anticipate Phase II construction of an attached warehouse facility to the south.
•The Project shall be certified under the Green Globe" Certification system, Green Globe Level 2. Refer to Specification Section 018113 Sustainable Design Requirements.
•Materials and products for the Project shall be compliant with the federal government "Buy American Requirement

Addenda 06.pdf
Addenda 07.pdf
Addenda 08.pdf
Addenda 5 drawings Phase I.pdf
Addenda 5 drawings Phase II.pdf
Addenda 05.pdf
Addenda 03A.pdf
Addenda 04.pdf
Addenda 01.pdf
Addenda 02.pdf
Addenda 03.pdf
01 Phase 1 Drawings.pdf
02 Phase 1 Landscape Drawings.pdf
03 Phase 1 Civil.pdf
04 Phase 1 Architectural.pdf
05 Phase 1 Structural.pdf
06 Phase 1 Furniture Drawings.pdf
07 Phase 1 Mechanical Drawings.pdf
08 Phase 1 Plumbing Drawings.pdf
09 Phase 1 Electrical Drawings.pdf
10 Phase 1 Fire Protections Drawings.pdf
Phase 2 Architectural.pdf
Phase 2 Civil Drawings.pdf
Phase 2 Electrical.pdf
Phase 2 Fire Protection.pdf
Phase 2 Mechanical.pdf
Phase 2 Plumbing.pdf
Phase 2 Structural.pdf
General Requirements.pdf
Geotechnical Investigation Report.pdf
Spec Book Phase I.pdf
Spec Book Phase II.pdf

Total Files32
Create DateApril 18, 2017
Last UpdatedMay 16, 2017
Download was expired on July 11, 2017 12:00 AM