Spokane Riverfront Park & Ice Rink

Riverfront Park Recreation Ice Rink & Skyride Facility Scope of Work:

The work will include but not be limited to the ice facility and the systems associated to the ice facility, an adjacent structure, and the related site improvements. The adjacent structure is an approximately 6,991 square foot structure the houses ticketing, restrooms and relate support spaces and other Work indicated in the Contract Documents. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Existing Conditions, Division 3 - Concrete, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 9 - Finishes, Division 10 - Specialties, Division 11 - Equipment, Division 12 - Furnishings, Division 13 - Special Construction, Division 21 - Fire Suppression, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical, Division 27 - Communications, Division 28 - Electronic Safety and Security, Division 31 - Earthwork, Division 32 - Exterior Improvements, Division 33 - Utilities.

File
ASI 1.pdf
Addendum 04 part 2.pdf
Addendum 04 part 3.pdf
Addendum 04 part 4.pdf
Addendum 04 part 5.pdf
Addendum 04 part 6.pdf
Addendum _3.pdf
Addendum_04.pdf
Addendum_05.pdf
Addendum_1.pdf
Addendum_2.pdf
02 Civil.pdf
03 Ice Rink.pdf
04 Landscape.pdf
05 Structural.pdf
06 Architectural.pdf
07 Kitchen.pdf
08 Mechanical.pdf
09 Electrical.pdf
Volume 1 - Divisions 00 to 20.pdf
Volume 2 - Divisions 21 to 33.pdf

Version
Download201
Stock
Total Files21
Create DateNovember 16, 2016
Last UpdatedFebruary 7, 2017
Download:
Download was expired on December 30, 2017 12:00 AM